San Matera Pool Repairs Update April 2019

The pool was originally anticipated to be reopened on March 25th, 2019 at 8 AM. However, in lieu of the new detail and the time of adjustment to address, please know that the pool area will remain CLOSED for use until further noticed. 

This notice is to serve as an update on the current repairs on the pool. As some of you have seen as you have approached the pool area and that you heard in the recent Board Meeting, the pool project uncovered the detail that behind the pool tiles, it was hollow. It was necessary to address and today upon review the hydraulic cement is still in the curing stage. The vendor will begin the reinstall of the tiles as soon as the cement is cured. Then the setting of the plaster, resurfacing, and install of non-skid captiles on steps will commence. Once all steps are complete the pool will then begin to be refilled and set with the appropriate pool chemicals for test then use. The Thermeau Prestige Heat and Cool Electric Heater system will be installed once the containment wall has been installed.

Items to be addressed for repairs are as follows:

❖Repair of the two beams on either side of the pool.

❖Tile repair and re-grout of tiles.

❖Resurfacing the pool.

❖Installation of non-skid cap tiles on steps.

❖Installation of Thermeau Prestige and Cool Electric Heater. ❖New pool furniture to accompany.

As new updates are available, management will provide.

 

References
San Matera the Gardens Management Team. Retrieved 2019-04-09.